Clear height: what it means and why it decides everything
Clear height is the single most consequential dimension in an industrial bay. What it measures, where it is measured, and what each range of height allows.
Slab thickness and point loads, column grids, demising walls, drains and sumps — the structural facts that limit what you can put in a bay.
The slab and the frame decide what you can install, where you can install it, and whether you can rack at all. Neither is easy to change, and neither appears in any public record.
An industrial floor is normally a concrete slab on grade. What matters is not just thickness but the sub-base under it, the joint layout and the condition. A thin slab on a poor base will fail under rack posts long before a thick one on a good base.
If you are installing racking, have the rack supplier confirm the loads and get the landlord to confirm the slab design. Do not infer capacity from the fact that the last tenant racked it.
Columns are where the structural bay meets your floor plan. In a small bay you may have none, because the unit sits within a single structural module. In a wider unit, one or two columns can land exactly where you wanted an aisle.
Sketch your rack runs and vehicle paths on a plan with the columns marked before you commit. A column in the middle of a 30-foot-wide bay is not fatal, but it changes the aisle layout and it will be in the way of a forklift turning circle for the whole term.
The wall between you and the next bay is a fire separation, and in most multi-tenant industrial buildings it runs to the underside of the deck. It carries a fire-resistance rating set by the building code for the construction and occupancy, and anything you attach to it or cut through it engages that rating.
Running a conduit, a duct or a doorway through a demising wall means restoring the separation properly — with a rated assembly, a fire damper or a certified penetration seal. This is inspected, and it is a common source of deficiency at the end of a term.
Floor drains in industrial space are regulated, because what goes down them reaches the municipal system. A bay with a drain may have a sump, an interceptor or an oil–grit separator, and the tenant is usually responsible for its maintenance and for what is discharged.
If your process produces anything other than clean water, confirm what the discharge approval allows before you sign. Vehicle washing, food production, plating and paint operations all have specific requirements, and retrofitting an interceptor into a finished bay is expensive.
Usually yes, with the landlord's written consent, and often with an obligation to remove it and make good at the end of the term. Confirm both the slab's capacity and the lease's alterations clause before the racking arrives.
There is no single answer, and thickness alone does not tell you capacity — the sub-base, reinforcement and joint design matter as much. If loads matter to your operation, ask for the structural drawings rather than a thickness figure.
It depends on the lease and on the cause. Structural repair is commonly a landlord obligation and damage caused by the tenant's use is commonly the tenant's. Photograph the slab condition before you take possession — that record settles most of these arguments later.
Clear height is the single most consequential dimension in an industrial bay. What it measures, where it is measured, and what each range of height allows.
Dock versus grade loading, typical door sizes, levellers and ramps, and how to work out which configuration your operation actually needs.
We search the full Alberta industrial record — including buildings that are not advertised anywhere.